ADACON UK
    Sport & Leisure

    Modular Shower & Changing Facilities

    A shower and changing building has to cope with a whole squad arriving at once. The things that decide whether it works are the number of shower positions, how quickly hot water recovers, how the wet area drains, and how easily the walls and floor can be cleaned afterwards.

    Shower & Changing Facilities

    Get a price for shower & changing facilities

    Tell us what you need and we'll come back with pricing and lead times — usually within one working day.

    So we can call you back about your enquiry

    Enquiring about: Shower & Changing Facilities

    No obligation. We reply within one working day.

    Also available to hire

    Hire Shower & Changing Facilities in the UK

    Need shower & changing facilities for a fixed period? Hire it instead of buying. Adacon manufactures the building to your layout and hands it over on hire terms, then collects it when you no longer need it — with the same quality, fit-out and design freedom as a purchase.

    Same factory build
    The same shower & changing facilities we sell, manufactured to your layout — not a tired fleet unit.
    Weeks to years
    Hire for a project, a season, a term or several years, and extend if plans change.
    Any size or storey
    P300, P400 and P600 units joined side by side or stacked to two storeys.
    Ready to use
    Insulated, wired, lit and fitted out in the factory before it reaches site.
    Hire or buy — priced both ways
    Not sure? Tick compare and we price hire against buying for your period.
    UK-wide
    Delivery and collection quoted to your site as part of the hire price.
    Typical hire periods
    1–3 months3–12 months1–3 years3+ years

    Hire terms are flexible — tell us how long you need the unit and we will confirm the rate for that period.

    Get a hire price for shower & changing facilities

    Tell us when you need it and for how long. We reply with hire terms — and a purchase price too if you tick compare.

    What do you need inside?

    Up to 20MB per file

    Hire terms are flexible — tell us how long you need the unit and we will confirm the rate for that period. Delivery and collection for hire are quoted separately, based on distance, site access and the lifting equipment required.

    Built for a full squad showering at once

    We set the shower positions, drainage falls and ventilation around peak use rather than average use. Wet-room flooring is welded and coved at the walls, wall surfaces are hygienic wipe-clean panels, and the changing benches sit outside the wet zone so kit stays dry.

    • Communal shower runs or individual cubicles, to your preference
    • Welded wet-room flooring with coved upstands and drainage falls
    • Hygienic wipe-clean wall panelling in the wet areas
    • Mechanical extract ventilation to clear steam between sessions
    • Hot water provision sized to the number of showers running together
    • Dry changing and drying zone kept separate from the wet area
    • Accessible shower provision where required

    Example configurations

    Buildings combine P300, P400 and P600 units — a P600 gives approx. 11.4 m² usable floor area. Units join side by side and stack over two storeys.

    1 module
    approx. 11.4 m² usable

    Compact shower and changing unit for a small team or staff shift.

    2 modules
    approx. 22.8 m² usable

    Changing benches plus a separate shower run and WC.

    4 modules
    approx. 45.6 m² usable

    Home and away shower and changing provision in one building.

    Shower & Changing Facilities — key facts

    P300 unit
    2.9m × 2.2m externally; approximately 2.7m × 2.0m usable internally
    P400 unit
    3.9m × 2.2m externally; approximately 3.7m × 2.0m usable internally
    P600 unit
    5.9m × 2.2m externally; approximately 5.7m × 2.0m usable internally
    Configuration
    Mix P300, P400 and P600 units to create tailored footprints and shapes
    Unit height
    2.40m external / 2.16m internal
    Storeys
    Up to two storeys, subject to final project design
    Delivery
    UK mainland and Northern Ireland — transport quoted separately

    Adacon modular buildings use P300, P400 and P600 units with external lengths of 2.9m, 3.9m and 5.9m, a common 2.2m width and 2.40m external / 2.16m internal height. The sizes can be combined to create more tailored floor areas and building shapes, joined side by side or stacked to two storeys subject to the final project design.

    What's available for a shower & changing facilitie

    Shower cubicles or communal runsWet-room flooringHygienic wall panelsExtract ventilationHeatingHot water provisionChanging benches and hooksWCs and wash basinsAccessible shower option

    Hot water sizing, drainage design and any connection to existing services are confirmed per site. Where the building forms part of a regulated facility, the specification is agreed project by project.

    Shower & Changing Facilities — photo gallery

    Modular Changing Rooms
    Modular Changing Rooms
    Toilet & Shower Blocks
    Toilet & Shower Blocks
    Clubhouses & Player Hubs
    Clubhouses & Player Hubs
    Modular Toilet Blocks
    Modular Toilet Blocks
    Modular Gyms
    Modular Gyms
    Changing Places Toilets
    Changing Places Toilets

    Design your shower and changing facility

    Set the shower numbers, changing space and WCs and get an estimated price.

    Shower & Changing Facilities — common questions