Complete Football Club Facilities
Most clubs do not need one building, they need a facility: home and away changing, showers, an officials' room, toilets and somewhere for the squad to meet. Because each part is a module, the whole facility can be drawn as one scheme and then built in the order your funding allows.

Get a price for complete football club facilities
Tell us what you need and we'll come back with pricing and lead times — usually within one working day.
Hire Complete Football Club Facilities in the UK
Need complete football club facilities for a fixed period? Hire it instead of buying. Adacon manufactures the building to your layout and hands it over on hire terms, then collects it when you no longer need it — with the same quality, fit-out and design freedom as a purchase.
Hire terms are flexible — tell us how long you need the unit and we will confirm the rate for that period.
Get a hire price for complete football club facilities
Tell us when you need it and for how long. We reply with hire terms — and a purchase price too if you tick compare.
Were you originally considering hiring?
We can compare the purchase price against your expected hire period.
One facility, drawn as a whole and built in phases
We plan the complete facility first — changing, showers, officials, WCs and the player hub — then split it into phases that each work on their own. Clubs commonly build changing and showers first and add the hub or social space once the next round of funding lands.
- Home and away changing rooms with separate external entrances
- Shower provision sized to the squads using it at the same time
- Officials' changing room with its own shower and WC
- Player and spectator WCs, including accessible provision
- Player hub — open-plan team meeting and analysis space
- Kit, groundskeeping and equipment storage
- Further modules linked later without disturbing the original building
Example configurations
Buildings combine P300, P400, P500, P600 and P700 units, with bespoke options. A separate P600 provides approximately 11.4 m² usable internally. Example areas use a conservative per-module allowance before partitions; open joins can provide more space. Units can be combined or stacked over two storeys.
Home changing, showers, away changing, showers — separate entrances, no internal connection.
Home and away changing with an officials' room and spectator WCs.
Changing facility, shower and WC building, and an open-plan player hub.
Changing, showers, WCs, player hub and a clubhouse or social area.
Complete Football Club Facilities — key facts
- P200 unit
- 1.9m × 2.2m externally; approximately 1.7m × 2.0m usable internally (3.4 m² usable internal area per separate unit)
- P300 unit
- 2.9m × 2.2m externally; approximately 2.7m × 2.0m usable internally (5.4 m² usable internal area per separate unit)
- P400 unit
- 3.9m × 2.2m externally; approximately 3.7m × 2.0m usable internally (7.4 m² usable internal area per separate unit)
- P500 unit
- 4.9m × 2.2m externally; approximately 4.7m × 2.0m usable internally (9.4 m² usable internal area per separate unit)
- P600 unit
- 5.9m × 2.2m externally; approximately 5.7m × 2.0m usable internally (11.4 m² usable internal area per separate unit)
- P700 unit
- 6.9m × 2.2m externally; approximately 6.7m × 2.0m usable internally (13.4 m² usable internal area per separate unit)
- Configuration
- Mix P200, P300, P400, P500, P600 and P700 units to create tailored footprints and shapes
- Bespoke
- Bespoke sizes considered to suit your brief — contact us
- Joined internal space
- Open joins remove the adjoining shell walls and can increase usable space. Final clear area depends on layout and partitions.
- Unit height
- 2.40m external / 2.16m internal
- Storeys
- Up to two storeys, subject to final project design
- Delivery
- UK mainland and Northern Ireland — transport quoted separately
Adacon modular buildings use P200, P300, P400, P500, P600 and P700 units with external lengths of 1.9m, 2.9m, 3.9m, 4.9m, 5.9m and 6.9m, a common 2.2m width and 2.40m external / 2.16m internal height. The sizes can be combined to create more tailored floor areas and building shapes, joined side by side or stacked to two storeys subject to the final project design.
What's available for a complete football club facilitie
Ground grading requirements, planning consent and connection to existing services are confirmed project by project. We supply a formal quotation, drawn layout, dimensions and lead time for grant and funding applications.
Complete Football Club Facilities — photo gallery






Plan your club facility
Tell us the squads, fixtures and facilities you need — we will draw the layout and quote it.
Complete Football Club Facilities — common questions
Related uses
Modular changing rooms for sports clubs, staff facilities and leisure sites. Benches, lockers, showers and wet/dry zoning. Configure yours online.
Modular shower blocks and changing facilities for sports clubs, schools and leisure sites — wet-room flooring, hygienic wall panels, ventilation and hot water.
Modular clubhouses, sports pavilions and player hubs for football, rugby, cricket, tennis and padel clubs — meeting space, kitchenette, bar, WCs and changing.
Market stalls, trading chalets & kiosks
Need smaller trading units or a complete marketplace? See our steel-framed market stalls, Christmas chalets and kiosks — available singly or as multi-unit schemes.
View market stallsDesign options for this build
All design optionsLiving in one of these?
All modular homesUseful guides
Practical guidance on module sizes, configuration, fit-out and the factors that shape a tailored modular-building quotation.
Whether a modular building needs planning permission depends on its use, size, siting and duration. Read how the common cases usually work in the UK.
Modular buildings need a level, load-bearing base rather than traditional deep foundations. Learn what base types suit garden rooms, site offices and two-storey builds.
Built from five unit sizes, or bespoke
Every Adacon building is made from these units, or built to a bespoke size. Units can be combined — joined end to end, side by side, or stacked to two storeys — to create larger buildings.
| Unit | External footprint | Approximate usable internal area |
|---|---|---|
| P200 | 1.9m × 2.2m | 1.7m × 2.0m (≈3.4 m²) |
| P300 | 2.9m × 2.2m | 2.7m × 2.0m (≈5.4 m²) |
| P400 | 3.9m × 2.2m | 3.7m × 2.0m (≈7.4 m²) |
| P500 | 4.9m × 2.2m | 4.7m × 2.0m (≈9.4 m²) |
| P600 | 5.9m × 2.2m | 5.7m × 2.0m (≈11.4 m²) |
| P700 | 6.9m × 2.2m | 6.7m × 2.0m (≈13.4 m²) |
| Bespoke | Built to your size | Contact us |