Bathroom Pods & Prefabricated Washrooms
From a single toilet or shower to hundreds of bathrooms for a complete development.
Standalone. Integrated into an existing building. Or manufactured for incorporation into a new development.
Adacon supplies prefabricated bathroom, shower, WC and washroom solutions for projects ranging from individual commercial facilities to large developments requiring repeated bathroom pods. Solutions can be designed for integration into existing buildings, supplied as standalone modular facilities or manufactured for incorporation into new developments.
What do you need?
Where does it need to go?
What is a bathroom pod?
A bathroom pod is a prefabricated bathroom unit manufactured substantially offsite before being transported to a construction project for positioning, integration and the required final connections.
Bathroom pods can contain sanitaryware, internal finishes, plumbing preparation, electrical elements and other components according to the project specification.
They are commonly used where projects require repeated bathroom installations, including apartment developments, hotels, student accommodation, build-to-rent schemes, housing developments, care facilities and other multi-unit projects.
Not just for large developments
Bathroom pods are often associated with developments requiring hundreds of identical bathrooms, but Adacon can also consider individual prefabricated toilet, shower and washroom requirements.
- Single WC for a commercial building
- Toilet and shower for a mezzanine
- Staff washroom inside a warehouse
- Shower facilities for a sports or leisure business
- WC facilities inside a factory
- Washroom for an office or workshop
- Bespoke commercial bathroom
- Individual accessible facility where appropriate
From one facility to hundreds of repeated pods.
Multi-unit bathroom pod projects
Projects can involve 20, 50, 65, 100 or 200+ bathrooms. Where a development contains repeated bathroom layouts, offsite production can allow bathroom manufacture to take place while other construction work continues.
- Reduced onsite wet trades
- Reduced site congestion
- Parallel production alongside other construction work
- More repeatable quality
- Simplified coordination
- Reduced material movement through the development
- Potential programme savings
- Potential cost efficiencies
- Factory-controlled production
- Easier repeatability across multiple units
- Potential reduction in snagging and rework
These are potential benefits, assessed per project. Quantities shown are illustrative of the scale of projects that use bathroom pods, not a record of Adacon completed quantities. Savings are never guaranteed.
Flexible delivery & positioning
Not every prefabricated washroom requires a major crane operation. Depending on the design, weight, access and site conditions, units may be capable of being positioned using equipment such as a forklift or telehandler, while other projects may require a crane or other specialist lifting equipment.
Adacon can consider the delivery and positioning strategy as part of the project design, helping ensure the module is designed not only for the required facilities but also around how it will physically reach its final position.
- Forklift
- Telehandler
- Crane
- HIAB / crane-equipped delivery vehicle
- Other suitable mechanical handling methods
Access should be considered early in the design process. On an existing-building project we normally look at:
- Building entrance dimensions
- Roller-shutter and door openings
- Internal clearances
- Turning space
- Floor loading
- Mezzanine loading
- Module dimensions and weight
- Forklift or telehandler capacity and reach
- Lifting points
- Overhead restrictions
- Route to the final position
- Structural engineer requirements
- Site-specific lifting and handling plan
Positioning method is always project-specific. It depends on module dimensions and weight, lifting points, site access, structural design and an approved lifting and handling plan. We do not state that a particular forklift or telehandler is suitable without a project-specific assessment.
Manufactured substantially offsite, delivered to the project, mechanically positioned using a method appropriate to the site and module, and prepared for the required final connections.
Built around your project
Adacon's modular system includes a range of standard unit sizes that can be configured internally around the individual project. Multiple modules can be combined where larger facilities are required.
For projects where standard module dimensions are not appropriate, bespoke sizes and configurations can also be considered depending on project requirements and scale.
You don't need to know which module you need. Send us your drawings, available dimensions or requirements and our team can propose an appropriate solution.
Explore the section
Straight answers
Send us your project
Tell us what you need and where it needs to go. Drawings, a bathroom schedule or simple dimensions are all useful — none of them are essential.