Modular Changing Room Hire

    Players still need somewhere to change and shower when a pavilion is being rebuilt, a new pitch opens before its clubhouse, or a tournament needs extra capacity. A hired modular changing block is insulated and heated. Team rooms, showers, officials' changing and toilets are laid out around your fixture list.

    Hire terms are flexible — tell us how long you need the unit and we will confirm the rate for that period.

    Modular Changing Room Hire

    Who hires changing rooms

    Football, rugby and cricket clubs, schools, councils and leisure trusts, event organisers and contractors replacing sports pavilions.

    • —Changing rooms while a pavilion or clubhouse is rebuilt
    • —Facilities for a new pitch before its permanent building is funded
    • —Extra capacity for tournaments, festivals and training camps
    • —Officials' and referees' changing rooms
    • —School sports changing during PE block refurbishment

    How long people hire for

    Up to 3 months
    Tournaments, camps and short works
    3 to 12 months
    A playing season, pavilion refurbishment
    1 to 3 years
    Pavilion rebuilds and funding gaps
    Over 3 years
    Long-term need, worth comparing against purchase

    Delivery and collection for hire are quoted separately, based on distance, site access and the lifting equipment required.

    What the hire building includes

    • —Team changing rooms with benches and hooks
    • —Showers, toilets and hand-wash basins
    • —Officials' changing and accessible WC where the layout allows
    • —Hard-wearing, easy-clean floor and wall finishes
    • —Heating, lighting and ventilation

    Where it needs to stand

    • —A level, load-bearing standing near the pitches
    • —Water supply and drainage connection, or a plan for them
    • —Power for lighting, heating and water heating
    • —Delivery and lifting access to the ground

    Sizes come from the modular range: P300 2.9m × 2.2m, P400 3.9m × 2.2m, P600 5.9m × 2.2m, a common 2.2m width and 2.40m external / 2.16m internal height, joined to the footprint you need.

    Hire or buy?

    Hire makes sense when

    • —The permanent pavilion is being built or funded
    • —The extra capacity is for a season or an event
    • —Grant funding for a permanent building has not yet been awarded

    Buying makes sense when

    • —The club needs changing facilities permanently
    • —Grant funding is available for a permanent building
    • —Hire would run for many seasons

    If you are not sure, tick the comparison box below and we will price both for the period you need.

    Questions people ask about changing rooms hire

    How many teams can a hired changing block serve?

    Tell us your fixtures, including home and away teams, officials and any matches played at the same time, and we'll size the rooms and showers to suit.

    Can hired changing rooms meet league or governing-body guidance?

    Share the guidance you need to meet and we'll lay out the rooms around it. Your league or governing body confirms compliance.

    Can we hire now and apply for funding to buy later?

    Tick Compare hire vs purchase and we'll price both. The figures are useful evidence for a funding application.

    Do the showers need a mains connection?

    They need a water supply and a drainage route. We check what your ground has before manufacture.

    Get a hire price

    Tell us what you need, when you need it and for how long. We will confirm terms for that period.

    What do you need inside?

    Hire terms are flexible — tell us how long you need the unit and we will confirm the rate for that period. Delivery and collection for hire are quoted separately, based on distance, site access and the lifting equipment required.

    Other hire pages

    We deliver to UK mainland and Northern Ireland. Transport is quoted separately from the module price, based on distance, access and the lifting equipment required.