Professional Learning Spaces for Brighton Schools
Adacon provides a high-specification alternative to temporary cabins. We do not supply converted shipping containers; instead, we manufacture the P600 modular building system. Each module offers approximately 13m² of floor space, featuring a robust steel frame, full insulation, and high-quality internal finishes including plastered walls and LED lighting. These units are designed for permanent or long-term use, meeting the thermal and aesthetic standards required for modern education.
Configurations and Capacity
The P300/P400/P600 modular range is inherently flexible, allowing Brighton education providers to scale their facilities based on headcount and site availability. Units can be joined side-by-side or stacked to create two-storey buildings.
- Single Module (13m²): Ideal as a 1-to-1 SEN tutoring room, a small music practice studio, or a private office for departmental heads.
- Double Module (26m²): A common choice for specialist breakout spaces, small seminar rooms, or staff rooms.
- Four Modules and Above (52m²+): These configurations provide full-sized classroom environments, library extensions, or multi-purpose halls.
For large-scale requirements, you can arrange modules in L-shapes or long runs to fit specific courtyard footprints or playground perimeters. You can experiment with these layouts using our P600 configurator.
What is Included as Standard
Unlike basic shell units, Adacon buildings arrive finished and ready for final utility connection. Our standard package includes:
- Insulated floors, walls, and roof sections for year-round thermal comfort.
- Internal finishes: Plastered and painted walls, laminate flooring, and skirting.
- Electrical fit-out: LED ceiling panels and multiple double sockets.
- Double-glazed uPVC windows and high-security external doors.
- Customisable exterior cladding: Choose different colours for different elevations to match existing school branding or the local Brighton aesthetic.
Optional extras for the education sector include WC and shower compartments, integrated kitchenettes for staff rooms, air conditioning for climate control, and internal staircases for two-storey builds.
Indicative Pricing for Brighton Projects
Project costs vary based on the number of modules and the specific internal fit-out required. For modular classrooms in the Brighton and Hove area, price bands typically range from £30,000 to £90,000. This range covers everything from a high-spec single SEN room to a multi-module classroom block. Delivery covers the UK mainland and Northern Ireland, with transport quoted separately based on destination and access; offloading or cranage where required is separate. For a precise estimate tailored to your site, you can request a bespoke quote.
Delivery and Access in Brighton and Sussex
Brighton presents unique logistical challenges, from the narrow, terraced streets of Hanover to the busy central thoroughfares like the A23 and A27. Adacon manages the transport of modules from our production facility directly to your site. We are experienced in navigating the logistical constraints of the South Coast, including planning for crane lifts in tight urban playgrounds or coordinating deliveries to rural sites on the edge of the South Downs.
Delivery is typically managed via HGV with Hiab or via a separate crane hire if the units need to be lifted over existing structures. We recommend a full site access survey to identify low bridges or tight corners common in older parts of the city. Once on-site, the installation of the modules is measured in days, not months, which is vital for schools needing to complete works during half-term or summer breaks.
Why Choose Adacon for Education?
Brighton schools often face the pressure of increasing student numbers against limited physical space. Our modular classrooms offer a solution that is faster than traditional masonry builds and more durable than low-grade portables. Because our units are manufactured off-site in our Turkey facility, the noise, dust, and safety risks associated with a live construction site are significantly reduced. Our lead times are typically weeks rather than months, and we often have "Ready to Order" stock units available for immediate dispatch to help schools meet urgent January or September intake deadlines.
Planning and Regulations
While many modular buildings fall under specific planning categories, rules regarding permanent educational structures vary. We recommend that all Brighton and Hove clients consult with the local planning authority or a planning consultant to ensure compliance with local development plans and building regulations, particularly concerning fire safety and accessibility (Part M). Although we provide the building, ensuring the site meets these specific local requirements remains the customer's responsibility.
Related modular buildings
Design yours online — free
You can lay out a modular classrooms in Brighton yourself in a few minutes with the free Adacon P600 configurator: arrange the modules in 3D, pick your windows, doors and cladding colours wall by wall, and see an estimated price straight away. There is no obligation and no salesperson — save the design and we will pick it up from there.
Prefer to talk it through? Request a free quote and we will come back with a specification and price for your project.