ADACON UK
    4 Anthracite-clad modules, one storey, glazed doors and high windows, no terrace or shutters, Adacon P600 modular building
    Four-module, single-storey P600 site welfare unit for construction canteen, drying room and WC facilities.

    Site Welfare Units

    4-Module Site Welfare Unit with Canteen and WC

    This four-module P600 site welfare unit provides approximately 46 m² of internal space with a kitchenette, WC and shower. It suits construction sites requiring practical canteen, drying room and welfare facilities in one single-storey building.

    £51,600ex VAT

    £61,920 inc VAT · standard fitted specification. Delivery, groundworks and site-specific works quoted separately.

    Made to order: built in approx. 7–8 weeks, then delivery typically within 1–2 weeks.

    PLACE ORDER — NO PAYMENT TODAY

    Ready to order? Place your order online. We'll confirm delivery, access and final order details before accepting your order and issuing your invoice.

    Built to order in approx. 7–8 weeks, then delivery typically within 1–2 weeks. Delivery is priced by postcode and confirmed with your quote.

    Change the layout in the configurator
    Modules
    4
    Storeys
    1
    Floor area
    46 m²
    Footprint
    5.9m x 8.8m footprint

    What's included

    • Four linked P600 modules in a single-storey layout
    • 5.9m x 8.8m overall footprint
    • Approximately 46 m² internal floor area
    • Double-leaf glazed entrance door with two small windows
    • Ten high-level, top-only windows
    • Kitchenette, WC and shower included
    • Smooth Anthracite cladding with flat roof and slim fascia

    Wide single-storey welfare layout

    This configuration combines four P600 modules in a wide, single-storey arrangement. Each steel-framed module measures 5.9m by 2.2m, creating an overall footprint of 5.9m by 8.8m and approximately 46 m² of internal floor area. The linked layout provides a substantial shared space that can support canteen and drying functions alongside the fitted kitchenette, WC and shower.

    Designed for construction-sector buyers, the building provides the core facilities needed for day-to-day workforce welfare without adding a second storey. It forms part of Adacon’s range of site welfare units and is designed, manufactured and delivered as a complete modular building for installation across the UK.

    Module-by-module arrangement

    Module 1 forms the northern edge of the building. Its exposed 5.9m north wall contains a double-leaf glazed entrance door positioned between two small windows. This provides the main point of access and introduces natural light at the entrance. The exposed east and west ends of Module 1 each have one high-level, top-only window.

    Modules 2 and 3 sit within the centre of the wide layout. Their long sides connect to the adjoining modules, while both exposed 2.2m ends have a high-level, top-only window. This gives each central module controlled daylight from the east and west without using low-level glazing.

    Module 4 forms the southern edge. Its east and west ends each contain one high-level, top-only window, while the exposed 5.9m south wall has two further high-level, top-only windows. Across the complete building, the window arrangement brings light into the linked internal area while retaining useful wall space for the welfare layout.

    External finish and internal fit-out

    The exterior is finished in smooth Anthracite cladding. A flat roof and slim fascia keep the profile clean and straightforward, giving the building a consistent appearance on an active construction site.

    The standard fitted specification includes a kitchenette, WC and shower. These facilities allow the available floor area to be organised around eating, changing, drying and washing requirements. Final positioning and site service arrangements should be confirmed as part of the project specification. Alternative choices can be explored using the P600 configurator.

    Price and typical lead time

    The indicative price for this four-module configuration is £51,600 excluding VAT, or £61,920 including VAT. This price covers the standard fitted specification described here, including the kitchenette, WC and shower. Delivery, groundworks and any site-specific works are not included and are quoted separately after the location and access requirements have been reviewed.

    A typical lead time is 8–12 weeks. The final programme depends on specification confirmation, production scheduling, delivery access and site readiness. Adacon designs, manufactures and delivers P600 buildings, with delivery and installation available across the UK.

    Siting and site preparation

    The site must have suitable prepared groundworks for the 5.9m by 8.8m footprint, together with safe access for delivery and installation. The position should also account for the double-leaf entrance doors, external circulation and connections required by the kitchenette, WC and shower. Ground conditions, service routes, delivery access and any site-specific works must be assessed before installation; these items are priced separately from the indicative building cost.

    Full specification

    4 P600 modules (single storey), wide layout, 5.9m x 8.8m footprint, approx 46 m2 internal floor area.
    Exterior: smooth cladding in Anthracite. Roof: flat roof with slim fascia.
    Module 1 (ground floor) exposed walls — north (5.9m side): Small window + Glazed door (double) + Small window; east (2.2m end): Top-only window (high level); west (2.2m end): Top-only window (high level).
    Module 2 (ground floor) exposed walls — east (2.2m end): Top-only window (high level); west (2.2m end): Top-only window (high level).
    Module 3 (ground floor) exposed walls — east (2.2m end): Top-only window (high level); west (2.2m end): Top-only window (high level).
    Module 4 (ground floor) exposed walls — east (2.2m end): Top-only window (high level); south (5.9m side): Top-only window (high level) + Top-only window (high level); west (2.2m end): Top-only window (high level).
    Internal fit-out includes: kitchenette, WC, shower.

    Frequently asked questions

    Also available to hire

    Hire 4-Module Site Welfare Unit with Canteen and WC in the UK

    Need 4-module site welfare unit with canteen and wc for a fixed period? Hire it instead of buying. Adacon manufactures the building to your layout and hands it over on hire terms, then collects it when you no longer need it — with the same quality, fit-out and design freedom as a purchase.

    Same factory build
    The same 4-module site welfare unit with canteen and wc we sell, manufactured to your layout — not a tired fleet unit.
    Weeks to years
    Hire for a project, a season, a term or several years, and extend if plans change.
    Any size or storey
    P300, P400 and P600 units joined side by side or stacked to two storeys.
    Ready to use
    Insulated, wired, lit and fitted out in the factory before it reaches site.
    Hire or buy — priced both ways
    Not sure? Tick compare and we price hire against buying for your period.
    UK-wide
    Delivery and collection quoted to your site as part of the hire price.
    Typical hire periods
    1–3 months3–12 months1–3 years3+ years

    Hire terms are flexible — tell us how long you need the unit and we will confirm the rate for that period.

    Get a hire price for 4-module site welfare unit with canteen and wc

    Tell us when you need it and for how long. We reply with hire terms — and a purchase price too if you tick compare.

    What do you need inside?

    Hire terms are flexible — tell us how long you need the unit and we will confirm the rate for that period. Delivery and collection for hire are quoted separately, based on distance, site access and the lifting equipment required.

    Make it yours

    Change the module count, layout, windows, doors and finish — then get an instant estimate.

    Get a price for 4-Module Site Welfare Unit with Canteen and WC

    Tell us what you need and we'll come back with pricing and lead times — usually within one working day.

    So we can call you back about your enquiry

    Enquiring about: 4-Module Site Welfare Unit with Canteen and WC

    No obligation. We reply within one working day.