ADACON UK
    Four single-storey dark grey modules with a glazed door and high-level windows, Adacon P600 modular building
    Four-module, single-storey P600 site welfare unit for canteen, drying-room, WC and shower use on construction sites.

    Site Welfare Units

    4-Module Site Welfare Unit with WC and Shower

    This four-module, single-storey P600 site welfare unit provides approximately 46 m² of internal space with a kitchenette, WC and shower. It suits construction sites needing practical canteen, drying-room and washing facilities in one wide building.

    £51,600ex VAT

    £61,920 inc VAT · indicative configured estimate, subject to quotation. Transport depends on postcode and access; offloading, groundworks and site-specific works are separate.

    Made to order. Build and delivery timing will be confirmed with your quotation.

    PLACE ORDER

    Order the standard specification online. We'll confirm delivery, access and final order details before accepting your order and issuing your invoice.

    Built to order in approx. 7–8 weeks, then delivery typically within 1–2 weeks. Delivery is priced by postcode and confirmed with your quote.

    Change the layout in the configurator
    Modules
    4
    Storeys
    1
    Floor area
    46 m²
    Footprint
    5.9m x 8.8m footprint

    Design highlights

    • Four P600 modules arranged over one storey
    • 5.9m x 8.8m wide footprint
    • Approximately 46 m² internal floor area
    • Dark grey horizontal cladding
    • Single glazed entrance door with two small windows
    • Ten top-only high-level windows
    • Kitchenette, WC and shower included

    A practical welfare layout for construction sites

    This four-module P600 building is configured as a single-storey site welfare unit for the construction sector. With an approximate internal floor area of 46 m², it gives site teams a substantial, self-contained space for canteen, drying and washing facilities. The wide 5.9m x 8.8m footprint suits projects that need more usable floor area on one level rather than a stacked arrangement. See further applications for site welfare units.

    How the four modules are arranged

    Four 5.9m x 2.2m steel-framed P600 modules sit side by side to create the wide plan. They link together as one building, while each module retains its defined position within the overall configuration.

    Module 1 forms the north side and provides the main entrance. Its exposed 5.9m north wall has a small window, a single glazed door and a second small window. The exposed east and west end walls each have one top-only, high-level window.

    Module 2 sits immediately inside Module 1. Its exposed 2.2m east and west ends each contain one top-only, high-level window; no additional external door is specified for this module.

    Module 3 continues the central part of the plan. Like Module 2, it has one top-only, high-level window in each exposed end wall to the east and west.

    Module 4 forms the south side. Its exposed east and west ends each have one top-only, high-level window, while the 5.9m south wall has two further top-only, high-level windows. The glazed entrance and small windows are concentrated on the north elevation, with high-level windows distributed around the remaining exposed walls.

    Exterior and internal fit-out

    The exterior is finished in dark grey horizontal cladding, with a flat roof and slim fascia for a clean, low-profile appearance. Inside, the standard fitted specification includes a kitchenette, WC and shower. This supports day-to-day welfare use as a canteen and washing area, with space that can be planned around the drying-room needs typical of a construction site. The final operational arrangement should be checked against workforce numbers and site requirements.

    Price and standard specification

    The indicative price is £51,600 excluding VAT, or £61,920 including VAT, for the standard fitted specification described here. This covers the four-module, single-storey P600 configuration with its stated exterior finish, doors, windows, kitchenette, WC and shower. Delivery, groundworks and any site-specific works are not included and are quoted separately. You can review the system and explore options in the P600 configurator.

    Programme, delivery and siting

    A typical lead time is 8–12 weeks, subject to specification, order confirmation and current production scheduling. Adacon designs, manufactures and delivers the building, with delivery and installation available across the UK.

    The site must be ready before installation, with suitable level foundations or supports, clear delivery and lifting access, and provision for the required utility and drainage connections. Ground conditions, access constraints, service routes and any project-specific works should be assessed early, as these can affect both cost and programme. Delivery, groundworks, connections and other site-specific requirements will be confirmed through separate quotations where applicable.

    Full specification

    4 P600 modules (single storey), wide layout, 5.9m x 8.8m footprint, approx 46 m2 internal floor area.
    Exterior: horizontal cladding in Dark grey. Roof: flat roof with slim fascia.
    Module 1 (ground floor) exposed walls — north (5.9m side): Small window + Glazed door (single) + Small window; east (2.2m end): Top-only window (high level); west (2.2m end): Top-only window (high level).
    Module 2 (ground floor) exposed walls — east (2.2m end): Top-only window (high level); west (2.2m end): Top-only window (high level).
    Module 3 (ground floor) exposed walls — east (2.2m end): Top-only window (high level); west (2.2m end): Top-only window (high level).
    Module 4 (ground floor) exposed walls — east (2.2m end): Top-only window (high level); south (5.9m side): Top-only window (high level) + Top-only window (high level); west (2.2m end): Top-only window (high level).
    Internal fit-out includes: kitchenette, WC, shower.

    Frequently asked questions

    Also available to hire

    Hire 4-Module Site Welfare Unit with WC and Shower in the UK

    Need 4-module site welfare unit with wc and shower for a fixed period? Hire it instead of buying. Adacon manufactures the building to your layout and hands it over on hire terms, then collects it when you no longer need it — with the same quality, fit-out and design freedom as a purchase.

    Same factory build
    The same 4-module site welfare unit with wc and shower we sell, manufactured to your layout — not a tired fleet unit.
    Weeks to years
    Hire for a project, a season, a term or several years, and extend if plans change.
    Any size or storey
    P300, P400 and P600 units joined side by side or stacked to two storeys.
    Ready to use
    Insulated, wired, lit and fitted out in the factory before it reaches site.
    Hire or buy — priced both ways
    Not sure? Tick compare and we price hire against buying for your period.
    UK-wide
    Delivery and collection quoted to your site as part of the hire price.
    Typical hire periods
    1–3 months3–12 months1–3 years3+ years

    Hire terms are flexible — tell us how long you need the unit and we will confirm the rate for that period.

    Get a hire price for 4-module site welfare unit with wc and shower

    Tell us when you need it and for how long. We reply with hire terms — and a purchase price too if you tick compare.

    What do you need inside?

    Hire terms are flexible — tell us how long you need the unit and we will confirm the rate for that period. Delivery and collection for hire are quoted separately, based on distance, site access and the lifting equipment required.

    Make it yours

    Change the module count, layout, windows, doors and finish — then get an instant estimate.

    Get a price for 4-Module Site Welfare Unit with WC and Shower

    Tell us what you need and we'll come back with pricing and lead times — usually within one working day.

    So we can call you back about your enquiry

    Enquiring about: 4-Module Site Welfare Unit with WC and Shower

    No obligation. We reply within one working day.