
Site Welfare Units
3-Module Site Welfare Unit with WC and Shower
This single-storey site welfare unit combines three P600 modules, with a WC and shower requested for the final layout. It suits construction sites requiring practical canteen, drying room and welfare facilities within one connected building.
£41,100ex VAT
£49,320 inc VAT · indicative configured estimate, subject to quotation. Transport depends on postcode and access; offloading, groundworks and site-specific works are separate.
Made to order. Build and delivery timing will be confirmed with your quotation.
Order the standard specification online. We'll confirm delivery, access and final order details before accepting your order and issuing your invoice.
Built to order in approx. 7–8 weeks, then delivery typically within 1–2 weeks. Delivery is priced by postcode and confirmed with your quote.
- Modules
- 3
- Storeys
- 1
- Approx. usable internal area
- 34.2 m² before partitions
- External dimensions
- 11.8m x 4.4m footprint
Design highlights
- Three P600 modules in a single-storey grid layout
- 11.8m x 4.4m overall external footprint
- Approximately 34.2m² usable internal area before partitions
- Grey vertical ARLINE AR16016 grooved plank cladding
- Single glazed entrance door with small and high-level windows
- WC and shower requested for the final room layout
- Flat roof with approximately 120mm steel-frame fascia
Configuration and dimensions
This construction-sector welfare building combines three steel-framed P600 modules in a single-storey grid layout. Each module measures 5.9m by 2.2m, creating an overall external footprint of 11.8m by 4.4m. The building has approximately 34.2m² of usable internal area before partitions, based on a conservative per-module allowance. Connected open layouts may provide more usable space, depending on the final room divisions.
Each P600 module is 2.40m high externally, with a 2.16m internal ceiling and an approximate usable interior of 5.7m by 2.0m. This configuration forms part of the site welfare units range for construction sites needing canteen, drying room and WC facilities.
Windows and external access
Module 1 has a single glazed door on its exposed north wall, positioned with a small window on either side. Its exposed west end has two small windows. Module 2 has two high-level, top-only windows on both its exposed north and south walls, plus two small windows on the exposed east end.
Module 3 has two high-level, top-only windows on its exposed south wall. Its exposed east and west ends each have two small windows. These openings are specific to the stored three-module arrangement and support a mixture of accessible welfare space, privacy and daylight.
Selected exterior
All specified exposed walls have full-wall ARLINE AR16016 grooved plank cladding in Grey, applied between the steel frame with the boards running vertically. The selected walls are Module 1 north and west, Module 2 north, east and south, and Module 3 east, south and west. The building has a flat roof with an approximately 120mm steel-frame fascia and no additional fascia.
Requested internal fit-out
A WC and shower have been requested, with their positions and surrounding partitions to be confirmed in the final room layout. Bathroom walls use 40mm waterproof insulated sandwich panels as standard, while hygienic panels are available as an optional selection. Shower rooms use wet-room PVC flooring. Where selected, plaster applies outside the bathroom walls rather than within the wet area.
Elsewhere, insulated sandwich panels are the included internal wall finish. Alternative finishes and the allocation of canteen, drying or circulation space depend on the final room plan. These details are recorded through the configuration process and confirmed by quotation, so illustrated fixtures and finishes should not be treated as guaranteed inclusions.
Estimate and site requirements
The indicative configured estimate is £41,100 excluding VAT, or £49,320 including VAT, subject to quotation. This is a whole-configuration estimate; cladding is quote-only and is not separately itemised in public pricing. Transport is priced according to the delivery postcode and site access.
Offloading or cranage, groundworks and other site-specific works are separate. Final siting is subject to survey, with access, levels, ground conditions and operational requirements considered for the individual construction site. The quotation confirms the final specification, room layout, selected finishes, transport requirements and any site-related works.
Full specification
3 P600 modules (single storey), grid layout, 11.8m x 4.4m footprint, approx 34.2 m2 usable internal area before partitions (conservative per-module allowance; connected open layouts may provide more space). Each module is 2.40m externally with a 2.16m internal ceiling; its approximate usable interior is 5.7m x 2.0m. Exterior: ARLINE AR16016 grooved plank applied to exposed walls between the frame in Grey. Roof: flat roof with approximately 120mm steel-frame fascia (no extra fascia). Selected outside walls: Module 1 North wall: Full-wall cladding, Grey, ARLINE AR16016 grooved plank, vertical boards; Module 1 West wall: Full-wall cladding, Grey, ARLINE AR16016 grooved plank, vertical boards; Module 2 North wall: Full-wall cladding, Grey, ARLINE AR16016 grooved plank, vertical boards; Module 2 East wall: Full-wall cladding, Grey, ARLINE AR16016 grooved plank, vertical boards; Module 2 South wall: Full-wall cladding, Grey, ARLINE AR16016 grooved plank, vertical boards; Module 3 East wall: Full-wall cladding, Grey, ARLINE AR16016 grooved plank, vertical boards; Module 3 South wall: Full-wall cladding, Grey, ARLINE AR16016 grooved plank, vertical boards; Module 3 West wall: Full-wall cladding, Grey, ARLINE AR16016 grooved plank, vertical boards. Cladding prices are quote-only and must not be itemised in public copy. Module 1 P600 (ground floor) exposed walls — north (5.9m side): Small window + Glazed door (single) + Small window; west (2.2m end): Small window + Small window. Module 2 P600 (ground floor) exposed walls — north (5.9m side): Top-only window (high level) + Top-only window (high level); east (2.2m end): Small window + Small window; south (5.9m side): Top-only window (high level) + Top-only window (high level). Module 3 P600 (ground floor) exposed walls — east (2.2m end): Small window + Small window; south (5.9m side): Top-only window (high level) + Top-only window (high level); west (2.2m end): Small window + Small window. Requested fit-out to confirm in the final layout: WC, shower. Bathroom walls use 40mm waterproof insulated sandwich panels as standard, with hygienic panels optional; shower rooms use wet-room PVC flooring. Plaster applies outside bathroom walls when selected. Elsewhere insulated sandwich panels are the included wall finish; other finishes are selected for the final room layout.
Frequently asked questions
Make it yours
Change the module count, layout, windows, doors and finish — then get an instant estimate.
Get a price for 3-Module Site Welfare Unit with WC and Shower
Tell us what you need and we'll come back with pricing and lead times — usually within one working day.