    Off-site construction lead times: from order to installed building

    The programme is short because manufacture and site preparation happen at the same time. From design sign-off, factory production can be complete in as little as 7-8 weeks, and installation on site is usually a matter of days rather than months. While the modules are being built, you prepare the base and bring services to the position.

    Completed modular building on site shortly after installation
    Completed modular building on site shortly after installation

    Why it is faster

    Factory work is not weather-dependent, trades are not waiting on each other in sequence, and the building is finished internally before it leaves. On site, the heavy work is a single lift.

    What can extend it

    Complex two-storey configurations, extensive fit-out, bespoke glazing or cladding, and anything waiting on planning. Site readiness is the most common delay — if the base is not cured and level on the delivery date, the lift has to be rebooked.

    Running site works in parallel

    Use the manufacturing window for groundworks: base, drainage runs, water and power to the module position, and access for the delivery vehicle and crane. Done properly, the building is usable within days of arrival.

    Typical timeline from enquiry to handover

    Typical timeline from enquiry to handover
    StageTypical durationWhat happens
    Design and quoteDaysConfigure the building online or with us, agree the specification and receive a fixed quote.
    Order and sign-offDaysDeposit, final drawings and specification confirmed before manufacture starts.
    Factory manufactureFrom 7-8 weeksChassis, structure, insulation, glazing, electrics and internal finishes completed off-site.
    Site preparationRuns in parallelBase, drainage, services and access prepared while the modules are being built.
    Delivery and craning1 day (typical)Modules delivered by lorry and lifted into final position.
    Joining, connection and handoverA few daysModules joined, services connected, snagging and handover.

    Indicative figures based on the current module price. Site works, groundworks and service connections are quoted separately.

    Lead Times — common questions

    Start the clock on your build

    Design and sign off the specification now so factory production can begin.

    Get a price for Off-Site Lead Times

    Tell us what you need and we'll come back with pricing and lead times — usually within one working day.

    Enquiring about: Off-Site Lead Times

    No obligation. We reply within one working day.