
Site Offices
Single-Module P600 Site Office Configuration
This single-storey P600 site office uses one compact module with a requested kitchenette and WC fit-out. It is configured for main contractors and site managers who need a practical office for a construction site.
£14,100ex VAT
£16,920 inc VAT · indicative configured estimate, subject to quotation. Transport depends on postcode and access; offloading, groundworks and site-specific works are separate.
Made to order. Build and delivery timing will be confirmed with your quotation.
Order the standard specification online. We'll confirm delivery, access and final order details before accepting your order and issuing your invoice.
Built to order in approx. 7–8 weeks, then delivery typically within 1–2 weeks. Delivery is priced by postcode and confirmed with your quote.
- Modules
- 1
- Storeys
- 1
- Approx. usable internal area
- 11.4 m² before partitions
- External dimensions
- 5.9m x 2.2m footprint
Design highlights
- One P600 module arranged over a single storey
- 5.9m x 2.2m external footprint
- Approximately 11.4m2 usable internal area before partitions
- Vertical ARLINE AR16016 cladding in Anthracite on all walls
- Single glazed entrance door with multiple window openings
- Kitchenette and WC requested for final layout confirmation
- Flat roof with approximately 120mm steel-frame fascia
Compact site office layout
This P600 configuration comprises one steel-framed module arranged over a single storey. Its external footprint is 5.9m x 2.2m, with an external height of 2.40m and an internal ceiling height of approximately 2.16m. The approximate usable interior measures 5.7m x 2.0m, providing around 11.4m2 of usable internal area before partitions. This is a conservative per-module allowance for planning the requested internal fit-out.
Designed for the construction sector, the layout gives main contractors and site managers a contained working base within one module. Further information about this type of accommodation is available in our site offices section.
Windows and external access
The north-facing 5.9m wall contains one large window positioned between two small windows. The opposite south-facing wall has a single glazed door between two small windows, providing the building’s external entrance and additional glazing.
Each 2.2m end wall also includes two small windows. This means the east and west elevations both have paired small windows, while the longer elevations combine the openings specified for this stored design. Opening sizes and final construction details are confirmed through the quotation and layout process.
Anthracite external finish
All four outside walls are selected with full-wall ARLINE AR16016 grooved plank cladding in Anthracite. The boards run vertically and are applied to the exposed wall areas between the structural frame. This consistent selection covers the north, east, south and west elevations of the module.
Above the walls, the configuration uses a flat roof with an approximately 120mm steel-frame fascia. No additional fascia has been selected. Final fixture, material and finish details remain subject to the confirmed quotation and should not be inferred solely from illustrations.
Requested kitchenette and WC
A kitchenette and WC have been requested, with their arrangement to be confirmed in the final internal layout. Partition positions, room dimensions, sanitary items, kitchenette details and associated finishes are therefore not fixed by this brief.
Insulated sandwich panels are the included wall finish outside bathroom areas unless another finish is selected for the final room layout. Bathroom walls use 40mm waterproof insulated sandwich panels as standard, with hygienic panels available as an optional selection. Where plaster is selected, it applies outside the bathroom walls. If a shower room is selected during final specification, wet-room PVC flooring is used within that room; no shower is specified in this stored configuration. Other floor and wall finishes are confirmed with the final layout and quotation.
Estimate, transport and siting
The indicative configured estimate is £14,100 excluding VAT, or £16,920 including VAT, subject to quotation. Cladding costs are not separately itemised in public pricing. The design can be reviewed through the building configurator, but the stored configuration and final quotation govern what is supplied.
Transport is priced separately according to the delivery postcode and site access. Offloading or cranage, groundworks and other site-specific works are also separate. Placement and access requirements are subject to survey, including the suitability of the proposed location and the practical requirements for reaching and servicing the site.
Full specification
1 P600 module (single storey), single layout, 5.9m x 2.2m footprint, approx 11.4 m2 usable internal area before partitions (conservative per-module allowance; connected open layouts may provide more space). Each module is 2.40m externally with a 2.16m internal ceiling; its approximate usable interior is 5.7m x 2.0m. Exterior: ARLINE AR16016 grooved plank applied to exposed walls between the frame in Anthracite. Roof: flat roof with approximately 120mm steel-frame fascia (no extra fascia). Selected outside walls: Module 1 North wall: Full-wall cladding, Anthracite, ARLINE AR16016 grooved plank, vertical boards; Module 1 East wall: Full-wall cladding, Anthracite, ARLINE AR16016 grooved plank, vertical boards; Module 1 South wall: Full-wall cladding, Anthracite, ARLINE AR16016 grooved plank, vertical boards; Module 1 West wall: Full-wall cladding, Anthracite, ARLINE AR16016 grooved plank, vertical boards. Cladding prices are quote-only and must not be itemised in public copy. Module 1 P600 (ground floor) exposed walls — north (5.9m side): Small window + Large window + Small window; east (2.2m end): Small window + Small window; south (5.9m side): Small window + Glazed door (single) + Small window; west (2.2m end): Small window + Small window. Requested fit-out to confirm in the final layout: kitchenette, WC. Bathroom walls use 40mm waterproof insulated sandwich panels as standard, with hygienic panels optional; shower rooms use wet-room PVC flooring. Plaster applies outside bathroom walls when selected. Elsewhere insulated sandwich panels are the included wall finish; other finishes are selected for the final room layout.
Frequently asked questions
Make it yours
Change the module count, layout, windows, doors and finish — then get an instant estimate.
Get a price for Single-Module P600 Site Office Configuration
Tell us what you need and we'll come back with pricing and lead times — usually within one working day.