ADACON UK
    Single-storey modular toilet block in a prepared construction-site setting
    Four-module P600 modular toilet block configured for permanent WC provision at sites, events and sports grounds.

    Modular Toilet Blocks

    4-Module Single-Storey Modular Toilet Block

    This single-storey modular toilet block combines four P600 modules in a straight 23.6m run, with a requested WC fit-out to be confirmed in the final layout. It suits construction sites, events and sports grounds requiring permanent WC provision.

    £51,600ex VAT

    £61,920 inc VAT · indicative configured estimate, subject to quotation. Transport depends on postcode and access; offloading, groundworks and site-specific works are separate.

    Made to order. Build and delivery timing will be confirmed with your quotation.

    Call about this item
    PLACE ORDER

    Order the standard specification online. We'll confirm delivery, access and final order details before accepting your order and issuing your invoice.

    Built to order in approx. 7–8 weeks, then delivery typically within 1–2 weeks. Delivery is priced by postcode and confirmed with your quote.

    Change the layout in the configurator
    Modules
    4
    Storeys
    1
    Approx. usable internal area
    45.6 m² before partitions
    External dimensions
    23.6m x 2.2m footprint

    Design highlights

    • Four P600 modules in a single-storey run
    • 23.6m x 2.2m external footprint
    • Approximately 45.6m² usable internal area before partitions
    • Smooth Black Grey RAL 7021 insulated external panels
    • Single glazed entrance door with small and high-level windows
    • Requested WC fit-out to be confirmed in the final layout
    • Flat roof with approximately 120mm steel-frame fascia

    Four-module run layout

    This configuration uses four P600 steel-framed modules connected in a single-storey run. Together, they create an external footprint of 23.6m x 2.2m. Each module measures 5.9m x 2.2m, is 2.40m high externally and has a 2.16m internal ceiling height.

    The approximate usable interior of each module is 5.7m x 2.0m. Across all four modules, the building provides approximately 45.6m² of usable internal area before partitions, based on a conservative per-module allowance. A connected open layout may provide more usable space, depending on the final internal arrangement.

    External finish and roof

    The exposed outside walls are specified with smooth, vertical insulated sandwich panels in Black Grey, RAL 7021. These standard insulated panels are included on the north and south elevations of all four modules, the west end of Module 1 and the east end of Module 4.

    The building has a flat roof with an approximately 120mm steel-frame fascia. No additional fascia is specified. Final colours, finishes and fixture details are confirmed by quotation; cladding pricing is not itemised in public product information.

    Windows and entrance

    Module 1 has two high-level, top-only windows on its north wall. Its south wall contains a small window, one single glazed door and a second small window, while the exposed west end has one high-level, top-only window.

    Modules 2 and 3 each have two high-level, top-only windows on the north wall and two on the south wall. Module 4 follows the same arrangement on its north and south walls, with a further high-level, top-only window on the exposed east end. These are the openings stored for this configuration; their final detailing is confirmed as part of the quotation.

    Requested WC fit-out

    A WC is requested for the internal fit-out, with its position, partitioning, sanitary fixtures and associated room arrangement to be confirmed in the final design. This makes the configuration relevant to modular toilet blocks intended for construction-sector sites, events and sports grounds requiring permanent facilities.

    Bathroom walls use 40mm waterproof insulated sandwich panels as standard. Hygienic wall panels are available as an optional selection. Where plaster is selected, it applies outside the bathroom walls. If the final arrangement includes a shower room, wet-room PVC flooring is used within that room.

    Internal finishes

    Outside the bathroom area, insulated sandwich panels are the included internal wall finish. Other wall and floor finishes are selected according to the final room layout and quotation. No particular finish beyond those stored in this configuration should be treated as confirmed from an illustration alone.

    Quotation and site requirements

    The indicative configured estimate is £51,600 excluding VAT, or £61,920 including VAT, subject to quotation. Transport is priced separately according to the delivery postcode and site access. Offloading or cranage, groundworks and other site-specific works are also separate.

    Siting remains subject to survey, including access, ground conditions and the requirements of the prepared location. The final layout, WC provision, finishes, transport arrangements and site-specific scope are confirmed through the project quotation and configuration process.

    Full specification

    4 P600 modules (single storey), run layout, 23.6m x 2.2m footprint, approx 45.6 m2 usable internal area before partitions (conservative per-module allowance; connected open layouts may provide more space). Each module is 2.40m externally with a 2.16m internal ceiling; its approximate usable interior is 5.7m x 2.0m.
    Exterior: included vertical insulated sandwich panels in Black Grey (RAL 7021). Roof: flat roof with approximately 120mm steel-frame fascia (no extra fascia).
    Selected outside walls: Module 1 North wall: Standard insulated panel, Black Grey (RAL 7021), Smooth; Module 1 South wall: Standard insulated panel, Black Grey (RAL 7021), Smooth; Module 1 West wall: Standard insulated panel, Black Grey (RAL 7021), Smooth; Module 2 North wall: Standard insulated panel, Black Grey (RAL 7021), Smooth; Module 2 South wall: Standard insulated panel, Black Grey (RAL 7021), Smooth; Module 3 North wall: Standard insulated panel, Black Grey (RAL 7021), Smooth; Module 3 South wall: Standard insulated panel, Black Grey (RAL 7021), Smooth; Module 4 North wall: Standard insulated panel, Black Grey (RAL 7021), Smooth; Module 4 East wall: Standard insulated panel, Black Grey (RAL 7021), Smooth; Module 4 South wall: Standard insulated panel, Black Grey (RAL 7021), Smooth. Cladding prices are quote-only and must not be itemised in public copy.
    Module 1 P600 (ground floor) exposed walls — north (5.9m side): Top-only window (high level) + Top-only window (high level); south (5.9m side): Small window + Glazed door (single) + Small window; west (2.2m end): Top-only window (high level).
    Module 2 P600 (ground floor) exposed walls — north (5.9m side): Top-only window (high level) + Top-only window (high level); south (5.9m side): Top-only window (high level) + Top-only window (high level).
    Module 3 P600 (ground floor) exposed walls — north (5.9m side): Top-only window (high level) + Top-only window (high level); south (5.9m side): Top-only window (high level) + Top-only window (high level).
    Module 4 P600 (ground floor) exposed walls — north (5.9m side): Top-only window (high level) + Top-only window (high level); east (2.2m end): Top-only window (high level); south (5.9m side): Top-only window (high level) + Top-only window (high level).
    Requested fit-out to confirm in the final layout: WC. Bathroom walls use 40mm waterproof insulated sandwich panels as standard, with hygienic panels optional; shower rooms use wet-room PVC flooring. Plaster applies outside bathroom walls when selected. Elsewhere insulated sandwich panels are the included wall finish; other finishes are selected for the final room layout.

    Frequently asked questions

    Make it yours

    Change the module count, layout, windows, doors and finish — then get an instant estimate.

    Get a price for 4-Module Single-Storey Modular Toilet Block

    Tell us what you need and we'll come back with pricing and lead times — usually within one working day.

    So we can call you back about your enquiry

    Enquiring about: 4-Module Single-Storey Modular Toilet Block

    No obligation. We reply within one working day.