ADACON UK

    How much do off-site manufactured buildings and homes cost?

    Adacon modular buildings use P300, P400 and P600 units with external lengths of 2.9m, 3.9m and 5.9m, a common 2.2m width and 2.40m external / 2.16m internal height. The sizes can be combined to create more tailored floor areas and building shapes, joined side by side or stacked to two storeys subject to the final project design. The final total depends on the selected layout, fit-out, delivery and site requirements, and is calculated in the online designer.

    Modular building modules being manufactured off-site before delivery
    Modular building modules being manufactured off-site before delivery

    What is in the module price

    Each module includes the galvanised steel chassis, insulated walls, floor and roof, LED lighting, sockets, a consumer unit and an entrance door; wall and floor finishes and windows are chosen in your design. Transport and offloading are itemised separately in your quotation, priced by your site's location and access.

    What changes the price

    Module count and floor area, whether the building is single or two storeys, kitchens, toilets and shower rooms, internal partitions, additional windows and doors, full-height glazing, terraces and decking, cladding choices, and staircases where a second storey is required.

    What sits outside the building price

    Your base or foundations, groundworks, drainage and service connections, crane hire where site access requires a specific lift, and any planning or professional fees. These vary by site, so they are quoted separately rather than bundled into a headline figure.

    Comparing with a traditional build

    A conventional build spreads cost across months of trades, scaffolding, weather delays and site waste. Off-site concentrates the labour in the factory and compresses the programme, which is why the same floor area comes in materially lower — and why the number you are quoted is far more likely to be the number you pay.

    Cost — common questions

    Price your building in minutes

    Build the configuration you need in the designer and see the figure update as you go.

    Get a price for Off-Site Construction Costs

    Tell us what you need and we'll come back with pricing and lead times — usually within one working day.

    So we can call you back about your enquiry

    Enquiring about: Off-Site Construction Costs

    No obligation. We reply within one working day.